{"id":155317,"date":"2026-08-31T23:10:49","date_gmt":"2026-08-31T17:40:49","guid":{"rendered":"http:\/\/indusvalleytimes.com\/news\/?p=155317"},"modified":"2026-08-31T23:10:51","modified_gmt":"2026-08-31T17:40:51","slug":"tata-power-renewables-utility-portfolio-scales-to-12-3-gw-surpasses-7-gw-operational-capacity-with-commissioning-of-100-mw-project-at-kayathar-tamil-nadu","status":"publish","type":"post","link":"http:\/\/indusvalleytimes.com\/news\/tata-power-renewables-utility-portfolio-scales-to-12-3-gw-surpasses-7-gw-operational-capacity-with-commissioning-of-100-mw-project-at-kayathar-tamil-nadu\/","title":{"rendered":"Tata Power Renewables\u2019 Utility Portfolio Scales to 12.3 GW; Surpasses 7 GW Operational Capacity with Commissioning of 100 MW Project at Kayathar, Tamil Nadu"},"content":{"rendered":"\n<p class=\"caps\"><strong>By Payal Banerjee<\/strong><\/p>\n\n\n\n<p><strong>National, Aug. 31 :<\/strong>\u00a0 Tata Power Renewable Energy Limited (TPREL), one of India&#8217;s leading renewable energy companies, a subsidiary of The Tata Power Company Limited, has successfully commissioned its 100 MW Group Captive Solar Project (TNGC-2) at Vellalankottai and Nalandhula villages in Kayathar, Tamil Nadu. With this commissioning, TPREL utility portfolio now grows to 12.3 GW and has surpassed the landmark 7 GW operational capacity milestone, reinforcing its position as a leading force in India&#8217;s clean energy transition.<\/p>\n\n\n\n<p>The project will supply clean power to TP Solar Limited (40.625 MW), Tata Power&#8217;s solar manufacturing arm producing high-efficiency solar cells and modules, Tata Electronics Private Limited (53.125 MW), a leading electronics manufacturing company focused on semiconductors, precision engineering and advanced electronics and Tata Realty And Infrastructure Limited (6.25 MW), Tata Group&#8217;s real estate and infrastructure development company, reinforcing Tata Group Companies&#8217; commitment to sustainable operations and accelerating India&#8217;s clean energy transition.<\/p>\n\n\n\n<p>The project is designed to generate 240.63 million units (MUs) of clean electricity annually and is expected to offset approximately 1.5 lakh tonnes of CO\u2082 emissions per annum.<\/p>\n\n\n\n<p>One of the key highlights of the project is the first-of-its-kind deployment of the Flexible Terrain Compatible (FTC) Single Axis Tracker technology in India for a Tata project. Equipped with 2,61,660 Mono PERC bifacial solar modules, the project is engineered to maximise energy generation while improving operational efficiency across varying terrain conditions.<\/p>\n\n\n\n<p>The project highlights TPREL&#8217;s expertise in executing large-scale solar projects through engineering excellence, best-in-class construction practices and a steadfast focus on quality. The power generated will be transmitted through the Kayathar 400 kV Grid Substation (GSS), ensuring reliable evacuation and efficient delivery of renewable energy to the beneficiary companies.<\/p>\n\n\n\n<p>The Company\u2019s 7 GW operational capacity comprise more than 5.7 GW of solar and 1.3 GW of wind energy assets. Further strengthening its growth trajectory, TPREL has an additional 5.3 GW under various stages of development, including 2.2 GW of solar and 3.1 GW of wind projects, which are slated for phased commissioning over the next 6 to 24 months.<\/p>\n\n\n\n<p>This project further reinforces TPREL&#8217;s position as a leader in India&#8217;s renewable energy transition and reflects its continued commitment to delivering innovative, high-quality renewable energy solutions that support the country&#8217;s target of achieving 500 GW of non-fossil fuel capacity by 2030.<\/p>\n\n\n\n<p>With extensive expertise in large scale renewable energy assets, the company operates a broad portfolio of large-scale projects encompassing utility-scale solar, floating solar, and Battery Energy Storage System (BESS) projects.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>By Payal Banerjee National, Aug. 31 :\u00a0 Tata Power Renewable Energy Limited (TPREL), one of India&#8217;s leading renewable energy companies, a subsidiary of The Tata Power Company Limited, has successfully<\/p>\n","protected":false},"author":1,"featured_media":155318,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_exactmetrics_skip_tracking":false,"_exactmetrics_sitenote_active":false,"_exactmetrics_sitenote_note":"","_exactmetrics_sitenote_category":0,"footnotes":""},"categories":[13,46],"tags":[28761,1192,28762,2227,12725,26591],"class_list":["post-155317","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-business","category-top-stories","tag-captive-solar-project","tag-india","tag-kayathar","tag-tamil-nadu","tag-tata-power","tag-tata-power-renewable-energy-limited-tprel"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Tata Power Renewables\u2019 Utility Portfolio Scales to 12.3 GW; Surpasses 7 GW Operational Capacity with Commissioning of 100 MW Project at Kayathar, Tamil Nadu<\/title>\n<meta name=\"description\" content=\"Tata Power Renewables\u2019 Utility Portfolio Scales to 12.3 GW; Surpasses 7 GW Operational Capacity with Commissioning of 100 MW Project at\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"http:\/\/indusvalleytimes.com\/news\/tata-power-renewables-utility-portfolio-scales-to-12-3-gw-surpasses-7-gw-operational-capacity-with-commissioning-of-100-mw-project-at-kayathar-tamil-nadu\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Tata Power Renewables\u2019 Utility Portfolio Scales to 12.3 GW; Surpasses 7 GW Operational Capacity with Commissioning of 100 MW Project at Kayathar, Tamil Nadu\" \/>\n<meta property=\"og:description\" content=\"Tata Power Renewables\u2019 Utility Portfolio Scales to 12.3 GW; Surpasses 7 GW Operational Capacity with Commissioning of 100 MW Project at\" \/>\n<meta property=\"og:url\" content=\"http:\/\/indusvalleytimes.com\/news\/tata-power-renewables-utility-portfolio-scales-to-12-3-gw-surpasses-7-gw-operational-capacity-with-commissioning-of-100-mw-project-at-kayathar-tamil-nadu\/\" \/>\n<meta property=\"og:site_name\" content=\"Indus Valley Times\" \/>\n<meta property=\"article:published_time\" content=\"2026-08-31T17:40:49+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-08-31T17:40:51+00:00\" \/>\n<meta property=\"og:image\" content=\"http:\/\/indusvalleytimes.com\/news\/wp-content\/uploads\/2026\/08\/Tata-power.png\" \/>\n\t<meta property=\"og:image:width\" content=\"404\" \/>\n\t<meta property=\"og:image:height\" content=\"157\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"indadmin\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"indadmin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"http:\\\/\\\/indusvalleytimes.com\\\/news\\\/tata-power-renewables-utility-portfolio-scales-to-12-3-gw-surpasses-7-gw-operational-capacity-with-commissioning-of-100-mw-project-at-kayathar-tamil-nadu\\\/#article\",\"isPartOf\":{\"@id\":\"http:\\\/\\\/indusvalleytimes.com\\\/news\\\/tata-power-renewables-utility-portfolio-scales-to-12-3-gw-surpasses-7-gw-operational-capacity-with-commissioning-of-100-mw-project-at-kayathar-tamil-nadu\\\/\"},\"author\":{\"name\":\"indadmin\",\"@id\":\"https:\\\/\\\/indusvalleytimes.com\\\/news\\\/#\\\/schema\\\/person\\\/229ac2ee13eea90327e2e7301c3ef206\"},\"headline\":\"Tata Power Renewables\u2019 Utility Portfolio Scales to 12.3 GW; Surpasses 7 GW Operational Capacity with Commissioning of 100 MW Project at Kayathar, Tamil Nadu\",\"datePublished\":\"2026-08-31T17:40:49+00:00\",\"dateModified\":\"2026-08-31T17:40:51+00:00\",\"mainEntityOfPage\":{\"@id\":\"http:\\\/\\\/indusvalleytimes.com\\\/news\\\/tata-power-renewables-utility-portfolio-scales-to-12-3-gw-surpasses-7-gw-operational-capacity-with-commissioning-of-100-mw-project-at-kayathar-tamil-nadu\\\/\"},\"wordCount\":413,\"publisher\":{\"@id\":\"https:\\\/\\\/indusvalleytimes.com\\\/news\\\/#organization\"},\"image\":{\"@id\":\"http:\\\/\\\/indusvalleytimes.com\\\/news\\\/tata-power-renewables-utility-portfolio-scales-to-12-3-gw-surpasses-7-gw-operational-capacity-with-commissioning-of-100-mw-project-at-kayathar-tamil-nadu\\\/#primaryimage\"},\"thumbnailUrl\":\"http:\\\/\\\/indusvalleytimes.com\\\/news\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/Tata-power.png\",\"keywords\":[\"Captive Solar Project\",\"INDIA\",\"Kayathar\",\"tamil nadu\",\"Tata Power\",\"Tata Power Renewable Energy Limited (TPREL)\"],\"articleSection\":[\"Business\",\"Top Stories\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"http:\\\/\\\/indusvalleytimes.com\\\/news\\\/tata-power-renewables-utility-portfolio-scales-to-12-3-gw-surpasses-7-gw-operational-capacity-with-commissioning-of-100-mw-project-at-kayathar-tamil-nadu\\\/\",\"url\":\"http:\\\/\\\/indusvalleytimes.com\\\/news\\\/tata-power-renewables-utility-portfolio-scales-to-12-3-gw-surpasses-7-gw-operational-capacity-with-commissioning-of-100-mw-project-at-kayathar-tamil-nadu\\\/\",\"name\":\"Tata Power Renewables\u2019 Utility Portfolio Scales to 12.3 GW; Surpasses 7 GW Operational Capacity with Commissioning of 100 MW Project at Kayathar, Tamil Nadu\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/indusvalleytimes.com\\\/news\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"http:\\\/\\\/indusvalleytimes.com\\\/news\\\/tata-power-renewables-utility-portfolio-scales-to-12-3-gw-surpasses-7-gw-operational-capacity-with-commissioning-of-100-mw-project-at-kayathar-tamil-nadu\\\/#primaryimage\"},\"image\":{\"@id\":\"http:\\\/\\\/indusvalleytimes.com\\\/news\\\/tata-power-renewables-utility-portfolio-scales-to-12-3-gw-surpasses-7-gw-operational-capacity-with-commissioning-of-100-mw-project-at-kayathar-tamil-nadu\\\/#primaryimage\"},\"thumbnailUrl\":\"http:\\\/\\\/indusvalleytimes.com\\\/news\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/Tata-power.png\",\"datePublished\":\"2026-08-31T17:40:49+00:00\",\"dateModified\":\"2026-08-31T17:40:51+00:00\",\"description\":\"Tata Power Renewables\u2019 Utility Portfolio Scales to 12.3 GW; Surpasses 7 GW Operational Capacity with Commissioning of 100 MW Project at\",\"breadcrumb\":{\"@id\":\"http:\\\/\\\/indusvalleytimes.com\\\/news\\\/tata-power-renewables-utility-portfolio-scales-to-12-3-gw-surpasses-7-gw-operational-capacity-with-commissioning-of-100-mw-project-at-kayathar-tamil-nadu\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"http:\\\/\\\/indusvalleytimes.com\\\/news\\\/tata-power-renewables-utility-portfolio-scales-to-12-3-gw-surpasses-7-gw-operational-capacity-with-commissioning-of-100-mw-project-at-kayathar-tamil-nadu\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"http:\\\/\\\/indusvalleytimes.com\\\/news\\\/tata-power-renewables-utility-portfolio-scales-to-12-3-gw-surpasses-7-gw-operational-capacity-with-commissioning-of-100-mw-project-at-kayathar-tamil-nadu\\\/#primaryimage\",\"url\":\"http:\\\/\\\/indusvalleytimes.com\\\/news\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/Tata-power.png\",\"contentUrl\":\"http:\\\/\\\/indusvalleytimes.com\\\/news\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/Tata-power.png\",\"width\":404,\"height\":157},{\"@type\":\"BreadcrumbList\",\"@id\":\"http:\\\/\\\/indusvalleytimes.com\\\/news\\\/tata-power-renewables-utility-portfolio-scales-to-12-3-gw-surpasses-7-gw-operational-capacity-with-commissioning-of-100-mw-project-at-kayathar-tamil-nadu\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/indusvalleytimes.com\\\/news\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Tata Power Renewables\u2019 Utility Portfolio Scales to 12.3 GW; Surpasses 7 GW Operational Capacity with Commissioning of 100 MW Project at Kayathar, Tamil Nadu\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/indusvalleytimes.com\\\/news\\\/#website\",\"url\":\"https:\\\/\\\/indusvalleytimes.com\\\/news\\\/\",\"name\":\"Indus Valley Times\",\"description\":\"Leading Newspaper of Odisha\",\"publisher\":{\"@id\":\"https:\\\/\\\/indusvalleytimes.com\\\/news\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/indusvalleytimes.com\\\/news\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/indusvalleytimes.com\\\/news\\\/#organization\",\"name\":\"Indus Valley Times\",\"url\":\"https:\\\/\\\/indusvalleytimes.com\\\/news\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/indusvalleytimes.com\\\/news\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"http:\\\/\\\/indusvalleytimes.com\\\/news\\\/wp-content\\\/uploads\\\/2015\\\/07\\\/logo.png\",\"contentUrl\":\"http:\\\/\\\/indusvalleytimes.com\\\/news\\\/wp-content\\\/uploads\\\/2015\\\/07\\\/logo.png\",\"width\":440,\"height\":111,\"caption\":\"Indus Valley Times\"},\"image\":{\"@id\":\"https:\\\/\\\/indusvalleytimes.com\\\/news\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/indusvalleytimes.com\\\/news\\\/#\\\/schema\\\/person\\\/229ac2ee13eea90327e2e7301c3ef206\",\"name\":\"indadmin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9b6f9b03321fc8effd1d678eb205a8c244bf8b1ceb3282aa64a44cda4666e3ea?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9b6f9b03321fc8effd1d678eb205a8c244bf8b1ceb3282aa64a44cda4666e3ea?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9b6f9b03321fc8effd1d678eb205a8c244bf8b1ceb3282aa64a44cda4666e3ea?s=96&d=mm&r=g\",\"caption\":\"indadmin\"},\"url\":\"http:\\\/\\\/indusvalleytimes.com\\\/news\\\/author\\\/indadmin\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Tata Power Renewables\u2019 Utility Portfolio Scales to 12.3 GW; Surpasses 7 GW Operational Capacity with Commissioning of 100 MW Project at Kayathar, Tamil Nadu","description":"Tata Power Renewables\u2019 Utility Portfolio Scales to 12.3 GW; Surpasses 7 GW Operational Capacity with Commissioning of 100 MW Project at","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"http:\/\/indusvalleytimes.com\/news\/tata-power-renewables-utility-portfolio-scales-to-12-3-gw-surpasses-7-gw-operational-capacity-with-commissioning-of-100-mw-project-at-kayathar-tamil-nadu\/","og_locale":"en_US","og_type":"article","og_title":"Tata Power Renewables\u2019 Utility Portfolio Scales to 12.3 GW; Surpasses 7 GW Operational Capacity with Commissioning of 100 MW Project at Kayathar, Tamil Nadu","og_description":"Tata Power Renewables\u2019 Utility Portfolio Scales to 12.3 GW; Surpasses 7 GW Operational Capacity with Commissioning of 100 MW Project at","og_url":"http:\/\/indusvalleytimes.com\/news\/tata-power-renewables-utility-portfolio-scales-to-12-3-gw-surpasses-7-gw-operational-capacity-with-commissioning-of-100-mw-project-at-kayathar-tamil-nadu\/","og_site_name":"Indus Valley Times","article_published_time":"2026-08-31T17:40:49+00:00","article_modified_time":"2026-08-31T17:40:51+00:00","og_image":[{"width":404,"height":157,"url":"http:\/\/indusvalleytimes.com\/news\/wp-content\/uploads\/2026\/08\/Tata-power.png","type":"image\/png"}],"author":"indadmin","twitter_misc":{"Written by":"indadmin","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"http:\/\/indusvalleytimes.com\/news\/tata-power-renewables-utility-portfolio-scales-to-12-3-gw-surpasses-7-gw-operational-capacity-with-commissioning-of-100-mw-project-at-kayathar-tamil-nadu\/#article","isPartOf":{"@id":"http:\/\/indusvalleytimes.com\/news\/tata-power-renewables-utility-portfolio-scales-to-12-3-gw-surpasses-7-gw-operational-capacity-with-commissioning-of-100-mw-project-at-kayathar-tamil-nadu\/"},"author":{"name":"indadmin","@id":"https:\/\/indusvalleytimes.com\/news\/#\/schema\/person\/229ac2ee13eea90327e2e7301c3ef206"},"headline":"Tata Power Renewables\u2019 Utility Portfolio Scales to 12.3 GW; Surpasses 7 GW Operational Capacity with Commissioning of 100 MW Project at Kayathar, Tamil Nadu","datePublished":"2026-08-31T17:40:49+00:00","dateModified":"2026-08-31T17:40:51+00:00","mainEntityOfPage":{"@id":"http:\/\/indusvalleytimes.com\/news\/tata-power-renewables-utility-portfolio-scales-to-12-3-gw-surpasses-7-gw-operational-capacity-with-commissioning-of-100-mw-project-at-kayathar-tamil-nadu\/"},"wordCount":413,"publisher":{"@id":"https:\/\/indusvalleytimes.com\/news\/#organization"},"image":{"@id":"http:\/\/indusvalleytimes.com\/news\/tata-power-renewables-utility-portfolio-scales-to-12-3-gw-surpasses-7-gw-operational-capacity-with-commissioning-of-100-mw-project-at-kayathar-tamil-nadu\/#primaryimage"},"thumbnailUrl":"http:\/\/indusvalleytimes.com\/news\/wp-content\/uploads\/2026\/08\/Tata-power.png","keywords":["Captive Solar Project","INDIA","Kayathar","tamil nadu","Tata Power","Tata Power Renewable Energy Limited (TPREL)"],"articleSection":["Business","Top Stories"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"http:\/\/indusvalleytimes.com\/news\/tata-power-renewables-utility-portfolio-scales-to-12-3-gw-surpasses-7-gw-operational-capacity-with-commissioning-of-100-mw-project-at-kayathar-tamil-nadu\/","url":"http:\/\/indusvalleytimes.com\/news\/tata-power-renewables-utility-portfolio-scales-to-12-3-gw-surpasses-7-gw-operational-capacity-with-commissioning-of-100-mw-project-at-kayathar-tamil-nadu\/","name":"Tata Power Renewables\u2019 Utility Portfolio Scales to 12.3 GW; Surpasses 7 GW Operational Capacity with Commissioning of 100 MW Project at Kayathar, Tamil Nadu","isPartOf":{"@id":"https:\/\/indusvalleytimes.com\/news\/#website"},"primaryImageOfPage":{"@id":"http:\/\/indusvalleytimes.com\/news\/tata-power-renewables-utility-portfolio-scales-to-12-3-gw-surpasses-7-gw-operational-capacity-with-commissioning-of-100-mw-project-at-kayathar-tamil-nadu\/#primaryimage"},"image":{"@id":"http:\/\/indusvalleytimes.com\/news\/tata-power-renewables-utility-portfolio-scales-to-12-3-gw-surpasses-7-gw-operational-capacity-with-commissioning-of-100-mw-project-at-kayathar-tamil-nadu\/#primaryimage"},"thumbnailUrl":"http:\/\/indusvalleytimes.com\/news\/wp-content\/uploads\/2026\/08\/Tata-power.png","datePublished":"2026-08-31T17:40:49+00:00","dateModified":"2026-08-31T17:40:51+00:00","description":"Tata Power Renewables\u2019 Utility Portfolio Scales to 12.3 GW; Surpasses 7 GW Operational Capacity with Commissioning of 100 MW Project at","breadcrumb":{"@id":"http:\/\/indusvalleytimes.com\/news\/tata-power-renewables-utility-portfolio-scales-to-12-3-gw-surpasses-7-gw-operational-capacity-with-commissioning-of-100-mw-project-at-kayathar-tamil-nadu\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["http:\/\/indusvalleytimes.com\/news\/tata-power-renewables-utility-portfolio-scales-to-12-3-gw-surpasses-7-gw-operational-capacity-with-commissioning-of-100-mw-project-at-kayathar-tamil-nadu\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"http:\/\/indusvalleytimes.com\/news\/tata-power-renewables-utility-portfolio-scales-to-12-3-gw-surpasses-7-gw-operational-capacity-with-commissioning-of-100-mw-project-at-kayathar-tamil-nadu\/#primaryimage","url":"http:\/\/indusvalleytimes.com\/news\/wp-content\/uploads\/2026\/08\/Tata-power.png","contentUrl":"http:\/\/indusvalleytimes.com\/news\/wp-content\/uploads\/2026\/08\/Tata-power.png","width":404,"height":157},{"@type":"BreadcrumbList","@id":"http:\/\/indusvalleytimes.com\/news\/tata-power-renewables-utility-portfolio-scales-to-12-3-gw-surpasses-7-gw-operational-capacity-with-commissioning-of-100-mw-project-at-kayathar-tamil-nadu\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/indusvalleytimes.com\/news\/"},{"@type":"ListItem","position":2,"name":"Tata Power Renewables\u2019 Utility Portfolio Scales to 12.3 GW; Surpasses 7 GW Operational Capacity with Commissioning of 100 MW Project at Kayathar, Tamil Nadu"}]},{"@type":"WebSite","@id":"https:\/\/indusvalleytimes.com\/news\/#website","url":"https:\/\/indusvalleytimes.com\/news\/","name":"Indus Valley Times","description":"Leading Newspaper of Odisha","publisher":{"@id":"https:\/\/indusvalleytimes.com\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/indusvalleytimes.com\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/indusvalleytimes.com\/news\/#organization","name":"Indus Valley Times","url":"https:\/\/indusvalleytimes.com\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/indusvalleytimes.com\/news\/#\/schema\/logo\/image\/","url":"http:\/\/indusvalleytimes.com\/news\/wp-content\/uploads\/2015\/07\/logo.png","contentUrl":"http:\/\/indusvalleytimes.com\/news\/wp-content\/uploads\/2015\/07\/logo.png","width":440,"height":111,"caption":"Indus Valley Times"},"image":{"@id":"https:\/\/indusvalleytimes.com\/news\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/indusvalleytimes.com\/news\/#\/schema\/person\/229ac2ee13eea90327e2e7301c3ef206","name":"indadmin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/9b6f9b03321fc8effd1d678eb205a8c244bf8b1ceb3282aa64a44cda4666e3ea?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/9b6f9b03321fc8effd1d678eb205a8c244bf8b1ceb3282aa64a44cda4666e3ea?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/9b6f9b03321fc8effd1d678eb205a8c244bf8b1ceb3282aa64a44cda4666e3ea?s=96&d=mm&r=g","caption":"indadmin"},"url":"http:\/\/indusvalleytimes.com\/news\/author\/indadmin\/"}]}},"jetpack_featured_media_url":"http:\/\/indusvalleytimes.com\/news\/wp-content\/uploads\/2026\/08\/Tata-power.png","_links":{"self":[{"href":"http:\/\/indusvalleytimes.com\/news\/wp-json\/wp\/v2\/posts\/155317","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/indusvalleytimes.com\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/indusvalleytimes.com\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/indusvalleytimes.com\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/indusvalleytimes.com\/news\/wp-json\/wp\/v2\/comments?post=155317"}],"version-history":[{"count":1,"href":"http:\/\/indusvalleytimes.com\/news\/wp-json\/wp\/v2\/posts\/155317\/revisions"}],"predecessor-version":[{"id":155319,"href":"http:\/\/indusvalleytimes.com\/news\/wp-json\/wp\/v2\/posts\/155317\/revisions\/155319"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/indusvalleytimes.com\/news\/wp-json\/wp\/v2\/media\/155318"}],"wp:attachment":[{"href":"http:\/\/indusvalleytimes.com\/news\/wp-json\/wp\/v2\/media?parent=155317"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/indusvalleytimes.com\/news\/wp-json\/wp\/v2\/categories?post=155317"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/indusvalleytimes.com\/news\/wp-json\/wp\/v2\/tags?post=155317"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}