{"id":158493,"date":"2026-11-23T17:56:42","date_gmt":"2026-11-23T12:26:42","guid":{"rendered":"http:\/\/indusvalleytimes.com\/news\/?p=158493"},"modified":"2026-11-23T17:56:43","modified_gmt":"2026-11-23T12:26:43","slug":"am-ns-india-nears-full-commissioning-of-automotive-steel-complex-at-hazira","status":"publish","type":"post","link":"http:\/\/indusvalleytimes.com\/news\/am-ns-india-nears-full-commissioning-of-automotive-steel-complex-at-hazira\/","title":{"rendered":"AM\/NS India nears full commissioning of Automotive Steel Complex at Hazira"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><strong><mark style=\"background-color:rgba(0, 0, 0, 0);color:#9ff094\" class=\"has-inline-color\">By Tapaswini Sahoo<\/mark><\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-luminous-vivid-orange-color\">New Delhi, Nov 23 : <\/mark><\/strong>ArcelorMittal Nippon Steel India (AM\/NS India), a joint venture between ArcelorMittal and Nippon Steel, today announced that its integrated Automotive Steel Complex at Hazira, Gujarat, is nearing full commissioning. The complex will expand domestic availability of advanced high-strength and coated steels, helping Indian automakers reduce their reliance on imports for specialised grades.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The complex builds on the commissioning of the Continuous Galvanising and Annealing Line (CGAL) in 2024 and the Continuous Galvanising Line (CGL) in 2025, followed by the addition of the Pickling Line and Tandem Cold Mill (PLTCM), with an annual capacity of 2 million tonnes, in 2026.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">How the complex will support automakers<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The complex brings cold rolling, annealing and coating together at Hazira. Drawing on technology from ArcelorMittal and Nippon Steel, it can produce Advanced High-Strength Steel (AHSS) with tensile strengths of up to 1,180 MPa, along with galvanised (GI), galvannealed (GA) and press-hardened steel (PHS) grades.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Access to these grades gives automakers more options to use thinner steel in selected components, reducing vehicle weight while meeting strength requirements. The grades can also be used in structures designed to protect occupants in a crash, including B-pillars and door impact beams. Domestic sourcing can shorten lead times and give automakers and component suppliers more flexibility to plan production.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Ranjan Dhar, Director and Vice President \u2013 Sales and Marketing, AM\/NS India, said, \u201cThe Automotive Steel Complex at Hazira will give Indian automakers a domestic source for more of the specialised grades they have traditionally imported. These steels can help them build lighter vehicles and meet demanding safety requirements. With the upcoming Steel Service Centre at Sanand, we will also bring precision processing closer to customers. Together, these investments support Aatmanirbhar Bharat and strengthen India\u2019s automotive supply chain.\u201d<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Automotive Steel Service Centre at Sanand<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">AM\/NS India plans to commission a dedicated automotive Steel Service Centre (SSC) at Sanand, Gujarat, with an annual capacity of 500,000 tonnes. The centre will provide precision coil processing for automakers and component suppliers, complementing the company\u2019s existing service centres in Pune, Chennai and the National Capital Region (NCR).<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Earlier this year, AM\/NS India launched Zagnelis\u00ae Protect, a patented zinc\u2013aluminium\u2013magnesium coated steel that combines corrosion resistance and formability for automotive applications. It gives Indian automakers a locally manufactured option for applications that have relied on imported coated steel.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">AM\/NS India remains India\u2019s only integrated steelmaker with Green Steel certification<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">AM\/NS India, the first integrated steelmaker to receive certification under the Ministry of Steel\u2019s Green Steel Taxonomy, has renewed its four-star certification for hot-rolled coils (HRC) and three-star certification for cold-rolled coils (CRC). It has also secured its first three-star certification for steel plates.Underpinned by natural gas-based Direct Reduced Iron (DRI) steelmaking, waste heat recovery, electrolytic hydrogen integration, and increasing renewable energy adoption, these certified low-emission steels enable automotive OEMs to substantially lower their Scope 3 carbon footprint while meeting global sustainability mandates.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>By Tapaswini Sahoo New Delhi, Nov 23 : ArcelorMittal Nippon Steel India (AM\/NS India), a joint venture between ArcelorMittal and Nippon Steel, today announced that its integrated Automotive Steel Complex<\/p>\n","protected":false},"author":1,"featured_media":105357,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_exactmetrics_skip_tracking":false,"footnotes":""},"categories":[13],"tags":[28169,63],"class_list":["post-158493","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-business","tag-amns-india","tag-new-delhi"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>AM\/NS India nears full commissioning of Automot<\/title>\n<meta name=\"description\" content=\"AM\/NS India nears full commissioning of Automotive Steel Complex at HaziraAM\/NS India nears full commissioning of Automoti\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"http:\/\/indusvalleytimes.com\/news\/am-ns-india-nears-full-commissioning-of-automotive-steel-complex-at-hazira\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"AM\/NS India nears full commissioning of Automot\" \/>\n<meta property=\"og:description\" content=\"AM\/NS India nears full commissioning of Automotive Steel Complex at HaziraAM\/NS India nears full commissioning of Automoti\" \/>\n<meta property=\"og:url\" content=\"http:\/\/indusvalleytimes.com\/news\/am-ns-india-nears-full-commissioning-of-automotive-steel-complex-at-hazira\/\" \/>\n<meta property=\"og:site_name\" content=\"Indus Valley Times\" \/>\n<meta property=\"article:published_time\" content=\"2026-11-23T12:26:42+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-11-23T12:26:43+00:00\" \/>\n<meta property=\"og:image\" content=\"http:\/\/indusvalleytimes.com\/news\/wp-content\/uploads\/2023\/05\/AMNS-logo.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"448\" \/>\n\t<meta property=\"og:image:height\" content=\"252\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"indadmin\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"indadmin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"http:\\\/\\\/indusvalleytimes.com\\\/news\\\/am-ns-india-nears-full-commissioning-of-automotive-steel-complex-at-hazira\\\/#article\",\"isPartOf\":{\"@id\":\"http:\\\/\\\/indusvalleytimes.com\\\/news\\\/am-ns-india-nears-full-commissioning-of-automotive-steel-complex-at-hazira\\\/\"},\"author\":{\"name\":\"indadmin\",\"@id\":\"http:\\\/\\\/indusvalleytimes.com\\\/news\\\/#\\\/schema\\\/person\\\/229ac2ee13eea90327e2e7301c3ef206\"},\"headline\":\"AM\\\/NS India nears full commissioning of Automotive Steel Complex at Hazira\",\"datePublished\":\"2026-11-23T12:26:42+00:00\",\"dateModified\":\"2026-11-23T12:26:43+00:00\",\"mainEntityOfPage\":{\"@id\":\"http:\\\/\\\/indusvalleytimes.com\\\/news\\\/am-ns-india-nears-full-commissioning-of-automotive-steel-complex-at-hazira\\\/\"},\"wordCount\":499,\"publisher\":{\"@id\":\"http:\\\/\\\/indusvalleytimes.com\\\/news\\\/#organization\"},\"image\":{\"@id\":\"http:\\\/\\\/indusvalleytimes.com\\\/news\\\/am-ns-india-nears-full-commissioning-of-automotive-steel-complex-at-hazira\\\/#primaryimage\"},\"thumbnailUrl\":\"http:\\\/\\\/indusvalleytimes.com\\\/news\\\/wp-content\\\/uploads\\\/2023\\\/05\\\/AMNS-logo.jpg\",\"keywords\":[\"AMNS India\",\"New Delhi\"],\"articleSection\":[\"Business\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"http:\\\/\\\/indusvalleytimes.com\\\/news\\\/am-ns-india-nears-full-commissioning-of-automotive-steel-complex-at-hazira\\\/\",\"url\":\"http:\\\/\\\/indusvalleytimes.com\\\/news\\\/am-ns-india-nears-full-commissioning-of-automotive-steel-complex-at-hazira\\\/\",\"name\":\"AM\\\/NS India nears full commissioning of Automot\",\"isPartOf\":{\"@id\":\"http:\\\/\\\/indusvalleytimes.com\\\/news\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"http:\\\/\\\/indusvalleytimes.com\\\/news\\\/am-ns-india-nears-full-commissioning-of-automotive-steel-complex-at-hazira\\\/#primaryimage\"},\"image\":{\"@id\":\"http:\\\/\\\/indusvalleytimes.com\\\/news\\\/am-ns-india-nears-full-commissioning-of-automotive-steel-complex-at-hazira\\\/#primaryimage\"},\"thumbnailUrl\":\"http:\\\/\\\/indusvalleytimes.com\\\/news\\\/wp-content\\\/uploads\\\/2023\\\/05\\\/AMNS-logo.jpg\",\"datePublished\":\"2026-11-23T12:26:42+00:00\",\"dateModified\":\"2026-11-23T12:26:43+00:00\",\"description\":\"AM\\\/NS India nears full commissioning of Automotive Steel Complex at HaziraAM\\\/NS India nears full commissioning of Automoti\",\"breadcrumb\":{\"@id\":\"http:\\\/\\\/indusvalleytimes.com\\\/news\\\/am-ns-india-nears-full-commissioning-of-automotive-steel-complex-at-hazira\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"http:\\\/\\\/indusvalleytimes.com\\\/news\\\/am-ns-india-nears-full-commissioning-of-automotive-steel-complex-at-hazira\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"http:\\\/\\\/indusvalleytimes.com\\\/news\\\/am-ns-india-nears-full-commissioning-of-automotive-steel-complex-at-hazira\\\/#primaryimage\",\"url\":\"http:\\\/\\\/indusvalleytimes.com\\\/news\\\/wp-content\\\/uploads\\\/2023\\\/05\\\/AMNS-logo.jpg\",\"contentUrl\":\"http:\\\/\\\/indusvalleytimes.com\\\/news\\\/wp-content\\\/uploads\\\/2023\\\/05\\\/AMNS-logo.jpg\",\"width\":448,\"height\":252},{\"@type\":\"BreadcrumbList\",\"@id\":\"http:\\\/\\\/indusvalleytimes.com\\\/news\\\/am-ns-india-nears-full-commissioning-of-automotive-steel-complex-at-hazira\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"http:\\\/\\\/indusvalleytimes.com\\\/news\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"AM\\\/NS India nears full commissioning of Automotive Steel Complex at Hazira\"}]},{\"@type\":\"WebSite\",\"@id\":\"http:\\\/\\\/indusvalleytimes.com\\\/news\\\/#website\",\"url\":\"http:\\\/\\\/indusvalleytimes.com\\\/news\\\/\",\"name\":\"Indus Valley Times\",\"description\":\"Leading Newspaper of Odisha\",\"publisher\":{\"@id\":\"http:\\\/\\\/indusvalleytimes.com\\\/news\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"http:\\\/\\\/indusvalleytimes.com\\\/news\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"http:\\\/\\\/indusvalleytimes.com\\\/news\\\/#organization\",\"name\":\"Indus Valley Times\",\"url\":\"http:\\\/\\\/indusvalleytimes.com\\\/news\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"http:\\\/\\\/indusvalleytimes.com\\\/news\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"http:\\\/\\\/indusvalleytimes.com\\\/news\\\/wp-content\\\/uploads\\\/2015\\\/07\\\/logo.png\",\"contentUrl\":\"http:\\\/\\\/indusvalleytimes.com\\\/news\\\/wp-content\\\/uploads\\\/2015\\\/07\\\/logo.png\",\"width\":440,\"height\":111,\"caption\":\"Indus Valley Times\"},\"image\":{\"@id\":\"http:\\\/\\\/indusvalleytimes.com\\\/news\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"http:\\\/\\\/indusvalleytimes.com\\\/news\\\/#\\\/schema\\\/person\\\/229ac2ee13eea90327e2e7301c3ef206\",\"name\":\"indadmin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9b6f9b03321fc8effd1d678eb205a8c244bf8b1ceb3282aa64a44cda4666e3ea?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9b6f9b03321fc8effd1d678eb205a8c244bf8b1ceb3282aa64a44cda4666e3ea?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9b6f9b03321fc8effd1d678eb205a8c244bf8b1ceb3282aa64a44cda4666e3ea?s=96&d=mm&r=g\",\"caption\":\"indadmin\"},\"url\":\"http:\\\/\\\/indusvalleytimes.com\\\/news\\\/author\\\/indadmin\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"AM\/NS India nears full commissioning of Automot","description":"AM\/NS India nears full commissioning of Automotive Steel Complex at HaziraAM\/NS India nears full commissioning of Automoti","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"http:\/\/indusvalleytimes.com\/news\/am-ns-india-nears-full-commissioning-of-automotive-steel-complex-at-hazira\/","og_locale":"en_US","og_type":"article","og_title":"AM\/NS India nears full commissioning of Automot","og_description":"AM\/NS India nears full commissioning of Automotive Steel Complex at HaziraAM\/NS India nears full commissioning of Automoti","og_url":"http:\/\/indusvalleytimes.com\/news\/am-ns-india-nears-full-commissioning-of-automotive-steel-complex-at-hazira\/","og_site_name":"Indus Valley Times","article_published_time":"2026-11-23T12:26:42+00:00","article_modified_time":"2026-11-23T12:26:43+00:00","og_image":[{"width":448,"height":252,"url":"http:\/\/indusvalleytimes.com\/news\/wp-content\/uploads\/2023\/05\/AMNS-logo.jpg","type":"image\/jpeg"}],"author":"indadmin","twitter_misc":{"Written by":"indadmin","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"http:\/\/indusvalleytimes.com\/news\/am-ns-india-nears-full-commissioning-of-automotive-steel-complex-at-hazira\/#article","isPartOf":{"@id":"http:\/\/indusvalleytimes.com\/news\/am-ns-india-nears-full-commissioning-of-automotive-steel-complex-at-hazira\/"},"author":{"name":"indadmin","@id":"http:\/\/indusvalleytimes.com\/news\/#\/schema\/person\/229ac2ee13eea90327e2e7301c3ef206"},"headline":"AM\/NS India nears full commissioning of Automotive Steel Complex at Hazira","datePublished":"2026-11-23T12:26:42+00:00","dateModified":"2026-11-23T12:26:43+00:00","mainEntityOfPage":{"@id":"http:\/\/indusvalleytimes.com\/news\/am-ns-india-nears-full-commissioning-of-automotive-steel-complex-at-hazira\/"},"wordCount":499,"publisher":{"@id":"http:\/\/indusvalleytimes.com\/news\/#organization"},"image":{"@id":"http:\/\/indusvalleytimes.com\/news\/am-ns-india-nears-full-commissioning-of-automotive-steel-complex-at-hazira\/#primaryimage"},"thumbnailUrl":"http:\/\/indusvalleytimes.com\/news\/wp-content\/uploads\/2023\/05\/AMNS-logo.jpg","keywords":["AMNS India","New Delhi"],"articleSection":["Business"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"http:\/\/indusvalleytimes.com\/news\/am-ns-india-nears-full-commissioning-of-automotive-steel-complex-at-hazira\/","url":"http:\/\/indusvalleytimes.com\/news\/am-ns-india-nears-full-commissioning-of-automotive-steel-complex-at-hazira\/","name":"AM\/NS India nears full commissioning of Automot","isPartOf":{"@id":"http:\/\/indusvalleytimes.com\/news\/#website"},"primaryImageOfPage":{"@id":"http:\/\/indusvalleytimes.com\/news\/am-ns-india-nears-full-commissioning-of-automotive-steel-complex-at-hazira\/#primaryimage"},"image":{"@id":"http:\/\/indusvalleytimes.com\/news\/am-ns-india-nears-full-commissioning-of-automotive-steel-complex-at-hazira\/#primaryimage"},"thumbnailUrl":"http:\/\/indusvalleytimes.com\/news\/wp-content\/uploads\/2023\/05\/AMNS-logo.jpg","datePublished":"2026-11-23T12:26:42+00:00","dateModified":"2026-11-23T12:26:43+00:00","description":"AM\/NS India nears full commissioning of Automotive Steel Complex at HaziraAM\/NS India nears full commissioning of Automoti","breadcrumb":{"@id":"http:\/\/indusvalleytimes.com\/news\/am-ns-india-nears-full-commissioning-of-automotive-steel-complex-at-hazira\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["http:\/\/indusvalleytimes.com\/news\/am-ns-india-nears-full-commissioning-of-automotive-steel-complex-at-hazira\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"http:\/\/indusvalleytimes.com\/news\/am-ns-india-nears-full-commissioning-of-automotive-steel-complex-at-hazira\/#primaryimage","url":"http:\/\/indusvalleytimes.com\/news\/wp-content\/uploads\/2023\/05\/AMNS-logo.jpg","contentUrl":"http:\/\/indusvalleytimes.com\/news\/wp-content\/uploads\/2023\/05\/AMNS-logo.jpg","width":448,"height":252},{"@type":"BreadcrumbList","@id":"http:\/\/indusvalleytimes.com\/news\/am-ns-india-nears-full-commissioning-of-automotive-steel-complex-at-hazira\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"http:\/\/indusvalleytimes.com\/news\/"},{"@type":"ListItem","position":2,"name":"AM\/NS India nears full commissioning of Automotive Steel Complex at Hazira"}]},{"@type":"WebSite","@id":"http:\/\/indusvalleytimes.com\/news\/#website","url":"http:\/\/indusvalleytimes.com\/news\/","name":"Indus Valley Times","description":"Leading Newspaper of Odisha","publisher":{"@id":"http:\/\/indusvalleytimes.com\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"http:\/\/indusvalleytimes.com\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"http:\/\/indusvalleytimes.com\/news\/#organization","name":"Indus Valley Times","url":"http:\/\/indusvalleytimes.com\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"http:\/\/indusvalleytimes.com\/news\/#\/schema\/logo\/image\/","url":"http:\/\/indusvalleytimes.com\/news\/wp-content\/uploads\/2015\/07\/logo.png","contentUrl":"http:\/\/indusvalleytimes.com\/news\/wp-content\/uploads\/2015\/07\/logo.png","width":440,"height":111,"caption":"Indus Valley Times"},"image":{"@id":"http:\/\/indusvalleytimes.com\/news\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"http:\/\/indusvalleytimes.com\/news\/#\/schema\/person\/229ac2ee13eea90327e2e7301c3ef206","name":"indadmin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/9b6f9b03321fc8effd1d678eb205a8c244bf8b1ceb3282aa64a44cda4666e3ea?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/9b6f9b03321fc8effd1d678eb205a8c244bf8b1ceb3282aa64a44cda4666e3ea?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/9b6f9b03321fc8effd1d678eb205a8c244bf8b1ceb3282aa64a44cda4666e3ea?s=96&d=mm&r=g","caption":"indadmin"},"url":"http:\/\/indusvalleytimes.com\/news\/author\/indadmin\/"}]}},"jetpack_featured_media_url":"http:\/\/indusvalleytimes.com\/news\/wp-content\/uploads\/2023\/05\/AMNS-logo.jpg","_links":{"self":[{"href":"http:\/\/indusvalleytimes.com\/news\/wp-json\/wp\/v2\/posts\/158493","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/indusvalleytimes.com\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/indusvalleytimes.com\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/indusvalleytimes.com\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/indusvalleytimes.com\/news\/wp-json\/wp\/v2\/comments?post=158493"}],"version-history":[{"count":1,"href":"http:\/\/indusvalleytimes.com\/news\/wp-json\/wp\/v2\/posts\/158493\/revisions"}],"predecessor-version":[{"id":158494,"href":"http:\/\/indusvalleytimes.com\/news\/wp-json\/wp\/v2\/posts\/158493\/revisions\/158494"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/indusvalleytimes.com\/news\/wp-json\/wp\/v2\/media\/105357"}],"wp:attachment":[{"href":"http:\/\/indusvalleytimes.com\/news\/wp-json\/wp\/v2\/media?parent=158493"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/indusvalleytimes.com\/news\/wp-json\/wp\/v2\/categories?post=158493"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/indusvalleytimes.com\/news\/wp-json\/wp\/v2\/tags?post=158493"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}