{"id":129405,"date":"2024-10-22T13:05:19","date_gmt":"2024-10-22T07:35:19","guid":{"rendered":"http:\/\/indusvalleytimes.com\/news\/?p=129405"},"modified":"2024-10-22T13:05:21","modified_gmt":"2024-10-22T07:35:21","slug":"tpcodl-activates-extensive-cyclone-dana-preparedness-plan-to-ensure-uninterrupted-power-supply","status":"publish","type":"post","link":"https:\/\/indusvalleytimes.com\/news\/tpcodl-activates-extensive-cyclone-dana-preparedness-plan-to-ensure-uninterrupted-power-supply\/","title":{"rendered":"TPCODL activates extensive Cyclone \u2018Dana\u2019 preparedness plan to ensure uninterrupted power supply"},"content":{"rendered":"\n<p class=\"caps\"><strong>By Prabhat Singh<\/strong><\/p>\n\n\n\n<p>Bhubaneswar, Oct. 22 \u2013 TP Central Odisha Distribution Limited (TPCODL), a joint venture of Tata Power and Government of Odisha, has implemented a comprehensive preparedness plan to mitigate the potential impacts of the cyclone \u2018Dana\u2019 on power supply and ensure the safety of its consumers. The company is committed to delivering uninterrupted electricity while prioritizing public safety during this challenging time.<\/p>\n\n\n\n<p>TPCODL has activated its Business Continuity and Disaster Management Plan (BCDMP), which includes an organized disaster response framework to handle varying levels of emergencies. The plan outlines clear action steps to monitor and assess real-time weather alerts, trigger timely pre-disaster warnings and execute a swift restoration process, should the power supply be disrupted.<\/p>\n\n\n\n<p><strong>Round-the-Clock Emergency Assistance<\/strong><\/p>\n\n\n\n<p>Consumers are urged to report any power-related emergencies via TPCODL\u2019s 24&#215;7 toll-free helplines: 1912\/18003457122. The company has stationed quick-response teams across multiple locations within its licensed areas to address potential issues swiftly and efficiently.<\/p>\n\n\n\n<p>Safety First: Advisory for Consumers<\/p>\n\n\n\n<p>As the cyclone draws near, TPCODL advises the public to follow these safety measures to prevent accidents and stay safe:<\/p>\n\n\n\n<p>\u2022 Avoid touching electrical installations, wires, or plumbing during thunderstorms, as they can conduct electricity<\/p>\n\n\n\n<p>\u2022 Seek shelter in safe structures and avoid taking cover under trees or temporary structures during strong winds and heavy rain<\/p>\n\n\n\n<p>\u2022 Do not attempt to handle any electrical equipment with wet hands or while standing in water without proper insulation<\/p>\n\n\n\n<p>\u2022 Keep children away from open storm drains and other water bodies during and after heavy rainfall<\/p>\n\n\n\n<p>\u201c<em>As Cyclone Dana approaches, we are fully prepared to ensure minimal disruption to the power supply. We have activated decentralized central room for real time monitoring of network and have implemented proactive measures to ensure sufficient arrangement of manpower and material at site. We are working closely with government agencies to safeguard both infrastructure and public safety. We urge everyone to follow safety guidelines and report any emergencies immediately<\/em>,\u201d said Mr. Arvind Singh, CEO, TPCODL<\/p>\n\n\n\n<p>The company has stocked essential equipment, including transformers, conductors &amp; poles to expedite any necessary restoration efforts. Specialized teams are on standby to ensure continuous power supply to critical emergency services such as hospitals and disaster response centers.<\/p>\n\n\n\n<p>TPCODL continues to coordinate closely with district administration and local authorities to stay ahead of the cyclone\u2019s potential impacts. By leveraging its robust operational framework and preparedness, the company aims to mitigate disruptions while ensuring the safety of both consumers and employees.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>By Prabhat Singh Bhubaneswar, Oct. 22 \u2013 TP Central Odisha Distribution Limited (TPCODL), a joint venture of Tata Power and Government of Odisha, has implemented a comprehensive preparedness plan to<\/p>\n","protected":false},"author":1,"featured_media":122142,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_exactmetrics_skip_tracking":false,"_exactmetrics_sitenote_active":false,"_exactmetrics_sitenote_note":"","_exactmetrics_sitenote_category":0,"footnotes":""},"categories":[13,46],"tags":[21319],"class_list":["post-129405","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-business","category-top-stories","tag-tp-central-odisha-distribution-limited-tpcodl-2"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>TPCODL activates extensive Cyclone \u2018Dana\u2019 preparedness plan to ensure uninterrupted power supply<\/title>\n<meta name=\"description\" content=\"TPCODL activates extensive Cyclone \u2018Dana\u2019 preparedness plan to ensure uninterrupted power supplyTPCODL activates extensive Cyclone \u2018Dana\u2019\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/indusvalleytimes.com\/news\/tpcodl-activates-extensive-cyclone-dana-preparedness-plan-to-ensure-uninterrupted-power-supply\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"TPCODL activates extensive Cyclone \u2018Dana\u2019 preparedness plan to ensure uninterrupted power supply\" \/>\n<meta property=\"og:description\" content=\"TPCODL activates extensive Cyclone \u2018Dana\u2019 preparedness plan to ensure uninterrupted power supplyTPCODL activates extensive Cyclone \u2018Dana\u2019\" \/>\n<meta property=\"og:url\" content=\"https:\/\/indusvalleytimes.com\/news\/tpcodl-activates-extensive-cyclone-dana-preparedness-plan-to-ensure-uninterrupted-power-supply\/\" \/>\n<meta property=\"og:site_name\" content=\"Indus Valley Times\" \/>\n<meta property=\"article:published_time\" content=\"2024-10-22T07:35:19+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-10-22T07:35:21+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/indusvalleytimes.com\/news\/wp-content\/uploads\/2024\/05\/TPCODL-Logo-Eng.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"640\" \/>\n\t<meta property=\"og:image:height\" content=\"272\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"indadmin\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"indadmin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/indusvalleytimes.com\\\/news\\\/tpcodl-activates-extensive-cyclone-dana-preparedness-plan-to-ensure-uninterrupted-power-supply\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/indusvalleytimes.com\\\/news\\\/tpcodl-activates-extensive-cyclone-dana-preparedness-plan-to-ensure-uninterrupted-power-supply\\\/\"},\"author\":{\"name\":\"indadmin\",\"@id\":\"https:\\\/\\\/indusvalleytimes.com\\\/news\\\/#\\\/schema\\\/person\\\/229ac2ee13eea90327e2e7301c3ef206\"},\"headline\":\"TPCODL activates extensive Cyclone \u2018Dana\u2019 preparedness plan to ensure uninterrupted power supply\",\"datePublished\":\"2024-10-22T07:35:19+00:00\",\"dateModified\":\"2024-10-22T07:35:21+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/indusvalleytimes.com\\\/news\\\/tpcodl-activates-extensive-cyclone-dana-preparedness-plan-to-ensure-uninterrupted-power-supply\\\/\"},\"wordCount\":414,\"publisher\":{\"@id\":\"https:\\\/\\\/indusvalleytimes.com\\\/news\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/indusvalleytimes.com\\\/news\\\/tpcodl-activates-extensive-cyclone-dana-preparedness-plan-to-ensure-uninterrupted-power-supply\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/indusvalleytimes.com\\\/news\\\/wp-content\\\/uploads\\\/2024\\\/05\\\/TPCODL-Logo-Eng.jpg\",\"keywords\":[\"TP Central Odisha Distribution Limited (TPCODL)\"],\"articleSection\":[\"Business\",\"Top Stories\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/indusvalleytimes.com\\\/news\\\/tpcodl-activates-extensive-cyclone-dana-preparedness-plan-to-ensure-uninterrupted-power-supply\\\/\",\"url\":\"https:\\\/\\\/indusvalleytimes.com\\\/news\\\/tpcodl-activates-extensive-cyclone-dana-preparedness-plan-to-ensure-uninterrupted-power-supply\\\/\",\"name\":\"TPCODL activates extensive Cyclone \u2018Dana\u2019 preparedness plan to ensure uninterrupted power supply\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/indusvalleytimes.com\\\/news\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/indusvalleytimes.com\\\/news\\\/tpcodl-activates-extensive-cyclone-dana-preparedness-plan-to-ensure-uninterrupted-power-supply\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/indusvalleytimes.com\\\/news\\\/tpcodl-activates-extensive-cyclone-dana-preparedness-plan-to-ensure-uninterrupted-power-supply\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/indusvalleytimes.com\\\/news\\\/wp-content\\\/uploads\\\/2024\\\/05\\\/TPCODL-Logo-Eng.jpg\",\"datePublished\":\"2024-10-22T07:35:19+00:00\",\"dateModified\":\"2024-10-22T07:35:21+00:00\",\"description\":\"TPCODL activates extensive Cyclone \u2018Dana\u2019 preparedness plan to ensure uninterrupted power supplyTPCODL activates extensive Cyclone \u2018Dana\u2019\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/indusvalleytimes.com\\\/news\\\/tpcodl-activates-extensive-cyclone-dana-preparedness-plan-to-ensure-uninterrupted-power-supply\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/indusvalleytimes.com\\\/news\\\/tpcodl-activates-extensive-cyclone-dana-preparedness-plan-to-ensure-uninterrupted-power-supply\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/indusvalleytimes.com\\\/news\\\/tpcodl-activates-extensive-cyclone-dana-preparedness-plan-to-ensure-uninterrupted-power-supply\\\/#primaryimage\",\"url\":\"https:\\\/\\\/indusvalleytimes.com\\\/news\\\/wp-content\\\/uploads\\\/2024\\\/05\\\/TPCODL-Logo-Eng.jpg\",\"contentUrl\":\"https:\\\/\\\/indusvalleytimes.com\\\/news\\\/wp-content\\\/uploads\\\/2024\\\/05\\\/TPCODL-Logo-Eng.jpg\",\"width\":640,\"height\":272,\"caption\":\"TPCODL Logo Eng\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/indusvalleytimes.com\\\/news\\\/tpcodl-activates-extensive-cyclone-dana-preparedness-plan-to-ensure-uninterrupted-power-supply\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/indusvalleytimes.com\\\/news\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"TPCODL activates extensive Cyclone \u2018Dana\u2019 preparedness plan to ensure uninterrupted power supply\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/indusvalleytimes.com\\\/news\\\/#website\",\"url\":\"https:\\\/\\\/indusvalleytimes.com\\\/news\\\/\",\"name\":\"Indus Valley Times\",\"description\":\"Leading Newspaper of Odisha\",\"publisher\":{\"@id\":\"https:\\\/\\\/indusvalleytimes.com\\\/news\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/indusvalleytimes.com\\\/news\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/indusvalleytimes.com\\\/news\\\/#organization\",\"name\":\"Indus Valley Times\",\"url\":\"https:\\\/\\\/indusvalleytimes.com\\\/news\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/indusvalleytimes.com\\\/news\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"http:\\\/\\\/indusvalleytimes.com\\\/news\\\/wp-content\\\/uploads\\\/2015\\\/07\\\/logo.png\",\"contentUrl\":\"http:\\\/\\\/indusvalleytimes.com\\\/news\\\/wp-content\\\/uploads\\\/2015\\\/07\\\/logo.png\",\"width\":440,\"height\":111,\"caption\":\"Indus Valley Times\"},\"image\":{\"@id\":\"https:\\\/\\\/indusvalleytimes.com\\\/news\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/indusvalleytimes.com\\\/news\\\/#\\\/schema\\\/person\\\/229ac2ee13eea90327e2e7301c3ef206\",\"name\":\"indadmin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9b6f9b03321fc8effd1d678eb205a8c244bf8b1ceb3282aa64a44cda4666e3ea?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9b6f9b03321fc8effd1d678eb205a8c244bf8b1ceb3282aa64a44cda4666e3ea?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9b6f9b03321fc8effd1d678eb205a8c244bf8b1ceb3282aa64a44cda4666e3ea?s=96&d=mm&r=g\",\"caption\":\"indadmin\"},\"url\":\"https:\\\/\\\/indusvalleytimes.com\\\/news\\\/author\\\/indadmin\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"TPCODL activates extensive Cyclone \u2018Dana\u2019 preparedness plan to ensure uninterrupted power supply","description":"TPCODL activates extensive Cyclone \u2018Dana\u2019 preparedness plan to ensure uninterrupted power supplyTPCODL activates extensive Cyclone \u2018Dana\u2019","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/indusvalleytimes.com\/news\/tpcodl-activates-extensive-cyclone-dana-preparedness-plan-to-ensure-uninterrupted-power-supply\/","og_locale":"en_US","og_type":"article","og_title":"TPCODL activates extensive Cyclone \u2018Dana\u2019 preparedness plan to ensure uninterrupted power supply","og_description":"TPCODL activates extensive Cyclone \u2018Dana\u2019 preparedness plan to ensure uninterrupted power supplyTPCODL activates extensive Cyclone \u2018Dana\u2019","og_url":"https:\/\/indusvalleytimes.com\/news\/tpcodl-activates-extensive-cyclone-dana-preparedness-plan-to-ensure-uninterrupted-power-supply\/","og_site_name":"Indus Valley Times","article_published_time":"2024-10-22T07:35:19+00:00","article_modified_time":"2024-10-22T07:35:21+00:00","og_image":[{"width":640,"height":272,"url":"https:\/\/indusvalleytimes.com\/news\/wp-content\/uploads\/2024\/05\/TPCODL-Logo-Eng.jpg","type":"image\/jpeg"}],"author":"indadmin","twitter_misc":{"Written by":"indadmin","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/indusvalleytimes.com\/news\/tpcodl-activates-extensive-cyclone-dana-preparedness-plan-to-ensure-uninterrupted-power-supply\/#article","isPartOf":{"@id":"https:\/\/indusvalleytimes.com\/news\/tpcodl-activates-extensive-cyclone-dana-preparedness-plan-to-ensure-uninterrupted-power-supply\/"},"author":{"name":"indadmin","@id":"https:\/\/indusvalleytimes.com\/news\/#\/schema\/person\/229ac2ee13eea90327e2e7301c3ef206"},"headline":"TPCODL activates extensive Cyclone \u2018Dana\u2019 preparedness plan to ensure uninterrupted power supply","datePublished":"2024-10-22T07:35:19+00:00","dateModified":"2024-10-22T07:35:21+00:00","mainEntityOfPage":{"@id":"https:\/\/indusvalleytimes.com\/news\/tpcodl-activates-extensive-cyclone-dana-preparedness-plan-to-ensure-uninterrupted-power-supply\/"},"wordCount":414,"publisher":{"@id":"https:\/\/indusvalleytimes.com\/news\/#organization"},"image":{"@id":"https:\/\/indusvalleytimes.com\/news\/tpcodl-activates-extensive-cyclone-dana-preparedness-plan-to-ensure-uninterrupted-power-supply\/#primaryimage"},"thumbnailUrl":"https:\/\/indusvalleytimes.com\/news\/wp-content\/uploads\/2024\/05\/TPCODL-Logo-Eng.jpg","keywords":["TP Central Odisha Distribution Limited (TPCODL)"],"articleSection":["Business","Top Stories"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/indusvalleytimes.com\/news\/tpcodl-activates-extensive-cyclone-dana-preparedness-plan-to-ensure-uninterrupted-power-supply\/","url":"https:\/\/indusvalleytimes.com\/news\/tpcodl-activates-extensive-cyclone-dana-preparedness-plan-to-ensure-uninterrupted-power-supply\/","name":"TPCODL activates extensive Cyclone \u2018Dana\u2019 preparedness plan to ensure uninterrupted power supply","isPartOf":{"@id":"https:\/\/indusvalleytimes.com\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/indusvalleytimes.com\/news\/tpcodl-activates-extensive-cyclone-dana-preparedness-plan-to-ensure-uninterrupted-power-supply\/#primaryimage"},"image":{"@id":"https:\/\/indusvalleytimes.com\/news\/tpcodl-activates-extensive-cyclone-dana-preparedness-plan-to-ensure-uninterrupted-power-supply\/#primaryimage"},"thumbnailUrl":"https:\/\/indusvalleytimes.com\/news\/wp-content\/uploads\/2024\/05\/TPCODL-Logo-Eng.jpg","datePublished":"2024-10-22T07:35:19+00:00","dateModified":"2024-10-22T07:35:21+00:00","description":"TPCODL activates extensive Cyclone \u2018Dana\u2019 preparedness plan to ensure uninterrupted power supplyTPCODL activates extensive Cyclone \u2018Dana\u2019","breadcrumb":{"@id":"https:\/\/indusvalleytimes.com\/news\/tpcodl-activates-extensive-cyclone-dana-preparedness-plan-to-ensure-uninterrupted-power-supply\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/indusvalleytimes.com\/news\/tpcodl-activates-extensive-cyclone-dana-preparedness-plan-to-ensure-uninterrupted-power-supply\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/indusvalleytimes.com\/news\/tpcodl-activates-extensive-cyclone-dana-preparedness-plan-to-ensure-uninterrupted-power-supply\/#primaryimage","url":"https:\/\/indusvalleytimes.com\/news\/wp-content\/uploads\/2024\/05\/TPCODL-Logo-Eng.jpg","contentUrl":"https:\/\/indusvalleytimes.com\/news\/wp-content\/uploads\/2024\/05\/TPCODL-Logo-Eng.jpg","width":640,"height":272,"caption":"TPCODL Logo Eng"},{"@type":"BreadcrumbList","@id":"https:\/\/indusvalleytimes.com\/news\/tpcodl-activates-extensive-cyclone-dana-preparedness-plan-to-ensure-uninterrupted-power-supply\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/indusvalleytimes.com\/news\/"},{"@type":"ListItem","position":2,"name":"TPCODL activates extensive Cyclone \u2018Dana\u2019 preparedness plan to ensure uninterrupted power supply"}]},{"@type":"WebSite","@id":"https:\/\/indusvalleytimes.com\/news\/#website","url":"https:\/\/indusvalleytimes.com\/news\/","name":"Indus Valley Times","description":"Leading Newspaper of Odisha","publisher":{"@id":"https:\/\/indusvalleytimes.com\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/indusvalleytimes.com\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/indusvalleytimes.com\/news\/#organization","name":"Indus Valley Times","url":"https:\/\/indusvalleytimes.com\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/indusvalleytimes.com\/news\/#\/schema\/logo\/image\/","url":"http:\/\/indusvalleytimes.com\/news\/wp-content\/uploads\/2015\/07\/logo.png","contentUrl":"http:\/\/indusvalleytimes.com\/news\/wp-content\/uploads\/2015\/07\/logo.png","width":440,"height":111,"caption":"Indus Valley Times"},"image":{"@id":"https:\/\/indusvalleytimes.com\/news\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/indusvalleytimes.com\/news\/#\/schema\/person\/229ac2ee13eea90327e2e7301c3ef206","name":"indadmin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/9b6f9b03321fc8effd1d678eb205a8c244bf8b1ceb3282aa64a44cda4666e3ea?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/9b6f9b03321fc8effd1d678eb205a8c244bf8b1ceb3282aa64a44cda4666e3ea?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/9b6f9b03321fc8effd1d678eb205a8c244bf8b1ceb3282aa64a44cda4666e3ea?s=96&d=mm&r=g","caption":"indadmin"},"url":"https:\/\/indusvalleytimes.com\/news\/author\/indadmin\/"}]}},"jetpack_featured_media_url":"https:\/\/indusvalleytimes.com\/news\/wp-content\/uploads\/2024\/05\/TPCODL-Logo-Eng.jpg","_links":{"self":[{"href":"https:\/\/indusvalleytimes.com\/news\/wp-json\/wp\/v2\/posts\/129405","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/indusvalleytimes.com\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/indusvalleytimes.com\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/indusvalleytimes.com\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/indusvalleytimes.com\/news\/wp-json\/wp\/v2\/comments?post=129405"}],"version-history":[{"count":1,"href":"https:\/\/indusvalleytimes.com\/news\/wp-json\/wp\/v2\/posts\/129405\/revisions"}],"predecessor-version":[{"id":129406,"href":"https:\/\/indusvalleytimes.com\/news\/wp-json\/wp\/v2\/posts\/129405\/revisions\/129406"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/indusvalleytimes.com\/news\/wp-json\/wp\/v2\/media\/122142"}],"wp:attachment":[{"href":"https:\/\/indusvalleytimes.com\/news\/wp-json\/wp\/v2\/media?parent=129405"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/indusvalleytimes.com\/news\/wp-json\/wp\/v2\/categories?post=129405"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/indusvalleytimes.com\/news\/wp-json\/wp\/v2\/tags?post=129405"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}